• info@henegia.eletric.it
  • Pericle Fazzini Square 8 San Benedetto del Tronto ITALY

Data Centers

Industry Pain Points

High Power Density
Data center servers and storage have high power density, requiring distribution systems to withstand heavy loads with excellent heat dissipation and power management.
Critical Power Continuity
24 hours operation demands zero outages and voltage fluctuations to avoid data loss or equipment damage.
Efficient Cooling Support
Equipment heat generation needs rational power allocation for balanced use between cooling systems and main devices.
PUE Optimization
Efficient distribution management is required to reduce transmission and conversion losses and lower PUE for cost and energy efficiency.

henegia Solutions

Data center digital power systems fully upgrade traditional electrical equipment in mechanics, operation, arc suppression, seismic resistance, and energy efficiency, ensuring higher-performance primary equipment.
Adopting domestic high-performance embedded platforms and IEC 61850 for integrated power monitoring, plus a "cloud-pipe-edge-device" architecture, they enable intelligent O&M and support full-life-cycle management of electrical equipment.

Related Products

Projects

GE PLATTLING project

GE PLATTLING project

France

Eaton Rolls Royce Project

Eaton Rolls Royce Project

America

GE  CIPREL3 project

GE CIPREL3 project

France

Lazio Solar Farm 7MW

Lazio Solar Farm 7MW

Italy

Copyright © 2026 Henegia Electric All Rights Reserved